— CASE STUDY
Healthcare Facility Flooring & Tile Takeoff
- CATEGORY
- HEALTHCARE / INSTITUTIONAL
- PROJECT TYPE
- New Bed Tower + CUP Expansion
- ROLE
- Flooring Estimator
- SOFTWARE
- MeasureSquare
- COVERAGE
- Basement + Levels 01–07
Flooring estimation and quantity takeoff by Syed Irtaza Hussain Rizvi. Architectural and interior design by others.
— 01
Project Overview
Prepared a comprehensive flooring and tile quantity takeoff for a multi-level healthcare facility project.
The estimating work covered the New Bed Tower + CUP Expansion, including the Basement and Levels 01–07.
The project involved detailed flooring finish takeoffs across a large healthcare environment, with measured floor plans, finish-specific coverage, 3D takeoff visualizations, tile layouts, interior elevations, bases, trims, waterproofing, and related flooring scope.
Building / level scope
- 01Basement
- 02Level 01
- 03Level 02
- 04Level 03
- 05Level 04
- 06Level 05
- 07Level 06
- 08Level 07
Deliverables
- Color-coded flooring takeoff plans
- Multi-level finish coverage plans
- Detailed flooring quantity takeoffs
- 3D takeoff visualizations
- Tile floor layouts
- Tile wall elevations
- Interior finish details
- Base and trim takeoffs
- Waterproofing takeoffs
- Material quantity summaries
Scope of Work
- Carpet
- LVT
- Resilient Tile
- Sheet Vinyl
- Floor Tile
- Wall Tile
- Bases
- Trims
- Waterproofing
- Related Flooring Finish Scope
— 02
Basement
— 03
Level 01
— 04
Level 02
— 05
Level 03
— 06
Levels 04–07
— 07
Tile Details & Elevations
— 08
Quantity / Estimating Details
Need a takeoff like this?
Client names, addresses and other confidential details, pricing and product information are omitted from this work sample.